Skip to main content
Image
Condition
CE 9.1: Settlement of Sidewalks, Driveways And Roadways
Article Type
Common Element
Article Number
9.1
Performance

Sidewalks, driveways, roadways and similar areas shall be constructed to prevent shifting or settlement that causes damage or affects intended use.

Warranty

One -Year – Work and Materials

Action

Components not meeting the acceptable condition shall be repaired.

Condition
CE 9.2: Landscaping Incomplete or Not According to Design
Article Type
Common Element
Article Number
9.2
Performance

The landscaping shall be completed according to the design and for more clarity, according to the landscape drawings approved by the municipality.

Warranty

One -Year – Work and Materials

Action

Landscaping not meeting the acceptable condition shall be repaired.

Condition
CE 9.3: The Shrubs, Tree(s), Plants, or Sod Have Died
Article Type
Common Element
Article Number
9.3
Performance

Landscaping plants supplied and installed by the builder and properly maintained by the condominium corporation shall be alive for the warranty period.

Warranty

One -Year – Work and Materials

Action

Plantings not meeting the acceptable performance requirements shall be replaced.

Condition
CE 9.4: Deteriorated Concrete Curbs and Sidewalks
Article Type
Common Element
Article Number
9.4
Performance

Concrete curbs and sidewalks shall not disintegrate to the extent that the aggregate is exposed.

Warranty

One -Year – Work and Materials

Action

Curbs and sidewalks not meeting the acceptable performance requirements shall be repaired.

Condition
CE 9.5: Ponding On Pedestrian Walkways and Driveways/Roadways
Article Type
Common Element
Article Number
9.5
Performance

Driveways and roadways that are designed to drain shall be constructed so that water drains off these surfaces without creating ponds which remain 24 hours after the rain event. Pedestrian sidewalks that are designed to drain shall be constructed so that water drains off these surfaces without creating accumulation/ponding that might create a safety hazard.

Warranty

One -Year – Work and Materials

Action

The surfaces not meeting the acceptable condition shall be repaired.

Condition
CE 9.6: Landscaping Not Sloped Away From Foundation Or Building Walls
Article Type
Common Element
Article Number
9.6
Performance

Landscaping shall be graded to prevent drainage towards the foundation or building walls.

Warranty

One -Year – Work and Materials. One - Year – Ontario Building Code Violations

Action

Surfaces not meeting the acceptable condition shall be repaired.

Condition
CE 9.7: Exterior Handrail/Guard/Fence Finish Deteriorated
Article Type
Common Element
Article Number
9.7
Performance

Handrail, guard and fence finishes shall remain intact for the warranty period.

Warranty

One -Year – Work and Materials

Action

Finishes not meeting the acceptable condition shall be repaired.

Condition
CE 9.8: Retaining Wall Shifting
Article Type
Common Element
Article Number
9.8
Warranty Year(s)
One Year
Performance

Retaining walls must remain in place without shifting in a manner which affects performance.

Warranty

One-Year - Work and Materials

Action

Retaining walls not meeting the acceptable performance requirements shall be repaired.

Condition
CE 9.9: Leakage Through Concrete Retaining Walls and Concrete Planter Walls
Article Type
Common Element
Article Number
9.9
Warranty Year(s)
One Year
Performance

Concrete retaining walls or planter walls shall not display water seepage unless the walls are designed to accommodate seepage without causing damage to the exposed finishes.

Warranty

One-Year - Work and Materials

Action

Walls not meeting the acceptable performance requirements shall be repaired.

Condition
CE 9.10: Water Ponding on Landscaping
Article Type
Common Element
Article Number
9.10
Performance

The site shall be graded to shed water in accordance to the requirements of the design. Where no grade is specified in the design for a slope, a minimum gradient of 2% is considered acceptable; sod or graveled areas may have a minimum gradient of 1%.

Warranty

One -Year – Work and Materials

Action

Site grading shall meet the acceptable condition by conforming to a municipally approved grading plan/site plan, where applicable.

Condition
FH 14.7 : Asphalt or Concrete Driveway has Cracked
Article Type
Freehold
Article Number
14.7
Warranty Year(s)
One Year
Performance

Cracks are acceptable if caused by factors other than a defect in work or materials provided by the builder.

Warranty

One-Year - Work and Materials• Damage resulting from normal shrinkage of materials caused by drying after construction, improper maintenance, normal wear and tear, subsidence of the land around the building, or alterations, deletions, or additions made by the homeowner is not covered by the statutory warranty.

Action

Cracks not meeting the acceptable condition shall be repaired.

Condition
FH 14.9: Sod/Seeding Not Completed
Article Type
Freehold
Article Number
14.9
Warranty Year(s)
One Year
Performance
Sod/seeding shall be installed in conditions conducive to growth, generally within one year ofthe occupancy of the home or within the time period required by governing municipalagreements or the phasing of the subdivision.
Warranty
One-Year - Incomplete WorkOne-Year - Work and Materials• Sod/seeding that fails due to improper maintenance is excluded from the statutory warranty
Action
Builder shall complete sod/seeding installation when conditions conducive to growth exist. Theinstallation of sod/seeding can coincide with subdivision phasing.
Condition
FH 14.13: Settling, Heaving or Separating of Landing or Steps
Article Type
Freehold
Article Number
14.13
Warranty Year(s)
One Year
Performance
Stairs and landings supported by a foundation shall not heave, settle or separate from the main building more than 25 mm. Stairs and landings not requiring a foundation are not restricted from movement.
Warranty
One-Year - Work and Materials. Two-Year - Ontario Building Code Health & Safety Violations. · Settlement and subsidence of the land around the building or along utility lines, other than subsidence beneath the footings of the building, is excluded from the statutory warranty. · Damage resulting from normal shrinkage of materials due to drying after construction is not covered by the statutory warranty.
Action
Stairs, landings and decks not meeting the acceptable performance shall be repaired.
Condition
FH 14.15: Exterior Deck Railing is Shaky
Article Type
Freehold
Article Number
14.15
Warranty Year(s)
Two Year
Performance
Exterior deck guards shall be designed and installed in accordance with the Building Code.
Warranty
Two-Year - Ontario Building Code Health & Safety Violations. · Damage resulting from improper maintenance or additions, deletions or alterations made by the homeowner is excluded from the statutory warranty.
Action
Exterior deck railings and guards not meeting the acceptable performance shall be repaired.
Condition
FH 14.16: Deck Board Spacing is Not Uniform
Article Type
Freehold
Article Number
14.16
Warranty Year(s)
One Year
Performance

Deck boards forming the walking surface shall be spaced to provide a generally uniform appearance.

Warranty

One-Year - Work and Materials. · Normal shrinkage of materials due to drying after construction is not covered by warranty.

Action

Deck boards not meeting the acceptable condition shall be repaired.

Remarks

Subsidence of land is not covered by the warranty. Components installed on the site (pavements, walkways etc.) must be adequately supported to prevent subsidence of the component.

Remarks

Plantings that fail due to improper maintenance are excluded from the statutory warranty.

Remarks

Owners must water and nurture landscaping plants after installation to maintain warranty coverage. Plants on municipal property such as boulevards and walkways are not covered by the statutory warranty.

Remarks

Impact damage caused by snow-plowing activities does not have warranty coverage. Some architectural finishes deliberately expose aggregate. This would not be considered deterioration.

Remarks

Ponding on site surface poses a particular safety risk due to ice formation so drainage of these components is important.

Remarks

Finishes can require frequent renewal due to exposure conditions, but should be designed and installed to be durable for the duration of the warranty period as a minimum. Damage to finishes related to owner activities is not warranted. This item is intended to cover all painted metal site features

Remarks

Typically municipalities require ponding in landscaped areas to dissipate within 48 to 72 hours after a water event (please also see REFERENCE final item number related to ponding on walkways and driveways) After the first year, the owner is responsible for maintaining the finished site grading to ensure ponding water does not adversely affect their premises.

Remarks

The condition is warranted where there is a demonstrated defect in work or material supplied by the builder. Cracks may develop in driveways due to environmental conditions, soil settlement, de-icing chemicals, or shrinkage of the asphalt or concrete, and are not warranted in those situations. Heavy loads from large vehicles can damage driveways.

Remarks
Identify any incomplete landscaping (that is the responsibility of the builder) at the PDI.Sod/seeding should only be installed when conditions are conducive to growth, typically midspring through mid-fall.The homeowner is responsible to maintain sod/seeding after installation is complete;maintenance requirements may vary.The installation of sod/seeding may be delayed as a result of:• Homes occupied when conditions are not conducive to growth• Phasing of sub-division work• Final grading related to municipal agreementsGrowing conditions vary according to geographic location.
Remarks
Concrete stairs having not more than two risers, and small wood stairs not attached to the building do not require foundations and are often affected by the settlement of supporting backfill; this is not covered by the statutory warranty.
Remarks
None.
Remarks

Spacing between boards may be adjusted during installation to allow for construction variances. See Also: 14.14 EXTERIOR DECK IS SPRINGY OR SHAKY

Need assistance from Tarion?

If you have questions about your home or the warranty, please Contact Us

Back